Cost Variance

Contract Performance Example – Cost Variance Trend

, , , ,

Monitoring the cost of a project is crucial in order to ensure that it stays within budget and is completed on time. One way to track this is by analyzing the cost variance, or the difference between the actual cost of the project and the budgeted cost. In this video, we will examine a specific example of a cost variance trend that has raised red flags and is causing concern. As the project nears its estimated completion date, the cost variance has dipped into negative territory and appears to be worsening. The chart in this video also provides a visual comparison of variances at completion to the current cost variance.

The cost variance in this video is a significant trend that has crossed into negative territory and appears to be decreasing even further past year 4, which is the estimated completion date. With so little time remaining, the negative cost variance trend is obviously a cause for concern. The chart in the video also shows visually the comparison of variances at completion to the current cost variance that we mentioned in the previous chart in the vidoe.


More EVMS Training

Take your EVMS training to the next level with our online course that is based on Humphreys & Associates’ highly regarded three-day EVMS workshop. We also offer a version of this same EVM training course customized for Department Of Defense (DOD) specific EVM requirements, as well as one designed specifically toward NASA’s EVM requirements!

— Purchase the DOD Course —
EVMS DOD Virtual Learning Lab

— Purchase the DOE Version of this Course —
EVMS DOE Virtual Learning Lab

— Purchase the NASA Version of this Course —
EVMS NASA Virtual Learning Lab

EVMS Document Matrix

EVMS Document Matrix

Not sure what the different requirements are between the DOE and NASA? Can’t remember if Cost and Software Data Reporting (CSDR) is required for an NSA contract? Check out our easy to read Earned Value Management Systems Document Matrix


All Online Courses

EVMS is a comprehensive approach to project management that encompasses all aspects of a project, from inception to completion. EVMS courses from Humphreys and Associates will give you the skills and knowledge you need to successfully manage EVM projects of all sizes.

Our EVMS courses are designed for both professionals who are new to EVM and those who are looking to brush up on their skills. We offer a variety of course types, from online self-paced courses to live virtual instructor-led courses. No matter what your schedule or learning style, we have a course that will fit your needs.

Plus, our instructors are experienced EVM professionals who will guide you through every step of the process, from setting up your EVMS system to closing out your project. With Humphreys and Associates, you can be confident that you’re getting the best EVMS training available.

Our online EVMS courses are affordable and convenient, so you can get the education you need without any hassle. Plus, our courses are designed to help you learn everything you need to know about EVMS in a short amount of time.

Get started today and find the perfect online EVMS course for you.

All Online Courses Available from Humphreys & Associates


Upcoming Public EVMS Workshops

EVM training sessions are offered throughout the year by H&A. EVMS, advanced Earned Value Management techniques, and project scheduling are all covered during these frequent public EVM workshops. These earned value education courses are ideal for anybody wanting to increase their understanding of or application of EVMS or scheduling. Our training programs are suited for individuals with various degrees.

Public EVMS Workshops are offered either in person or online. View our Upcoming EVM Workshop Schedule to find one that best suits your schedule and location.

Upcoming Earned Value Training Public Workshops

Contract Performance Example – Cost Variance Trend Read Post »

Contract Performance – Variance Thresholds

, , , , ,

Variance Thresholds are an important part of EVMS Variance Analysis. Project managers can use variance thresholds to help identify potential issues with cost and scheduleperformance. By setting these thresholds in advance, project managers can gain visibility into when a cost or schedule variance is trending at a level that needs to be addressed. The goal is to identify issues before they become catastrophic, and while there is still time to correct them before they impact project objectives.

There are a few different ways to set variance thresholds. One common approach is to base them on percentages of expected cost variance over time. This allows project managers to track performance and take corrective action if necessary.

Variance thresholds can be a valuable tool for managing contract performance. By setting these thresholds in advance, project managers can gain visibility into potential issues and take corrective action before they become catastrophic.

Indirect costs can be a tricky topic to navigate, but we’ve got you covered with our in-depth three-part series that breaks down how to determine responsibility for indirect costs.


More EVMS Training

You can now take your EVMS training to the next level with our online course that is based on Humphreys & Associates’ highly regarded three-day workshop. We also offer an extended version of this same program customized for Department Of Defense (DOD) specific requirements, as well one designed specifically toward NASA’s needs!

— Purchase the DOD Course —
EVMS DOD Virtual Learning Lab

— Purchase the DOE Version of this Course —
EVMS DOE Virtual Learning Lab

— Purchase the NASA Version of this Course —
EVMS NASA Virtual Learning Lab

EVMS Document Matrix

EVMS Document Matrix

Not sure what the different requirements are between the DOE and NASA? Can’t remember if Cost and Software Data Reporting (CSDR) is required for an NSA contract? Check out our easy to read Earned Value Management Systems Document Matrix


All Online Courses

EVM course by Humphreys and Associates will give you the skills needed to manage any project, no matter how big or small. The comprehensive approach covers everything from inception all the way through completion so that students can be confident they’re ready for anything when it comes time take on their next endeavor!

Courses are designed with both beginners in mind but also seasoned professionals who want a refresher or new knowledge update on certain aspects of managing these types of endeavors. You can learn anything from the comfort of your own home with our online self-paced courses. Or if you’re looking for an instructor led experience, we have that too! No matter what time zone or learning style we are suited to accommodate all students’ schedules.

Plus, our instructors are experienced EVM professionals who will guide you through every step of the process, from setting up your EVMS system to closing out your project. With Humphreys and Associates, you can be confident that you’re getting the best EVMS training available.

Our online EVMS courses are affordable and convenient, so you can get the education you need without any hassle. Plus, our courses are designed to help you learn everything you need to know about EVMS in a short amount of time.

Get started today and find the perfect online EVMS course for you.

All Online Courses Available from Humphreys & Associates


Upcoming Public EVMS Workshops

EVM training sessions are offered throughout the year by H&A. EVMS, advanced Earned Value Management techniques, and project scheduling are all covered during these frequent public EVM workshops. These earned value education courses are ideal for anybody wanting to increase their understanding of or application of EVMS or scheduling. Our training programs are suited for individuals with various degrees.

Public EVMS Workshops are offered either in person or online. View our Upcoming EVM Workshop Schedule to find one that best suits your schedule and location.

Upcoming Earned Value Training Public Workshops

Contract Performance – Variance Thresholds Read Post »

Contract Performance – Cost/Schedule Variance Trends

, , ,

EVM training is critical for project managers seeking to implement an earned value management system (EVMS) on their projects. One of the most important aspects of EVM is tracking cost and schedule variance trends. Cost variance is the difference between the earned value (the budgeted cost for work performed) and the actual costs of work performed. Schedule variance, on the other hand, is the difference between the earned value (actual progress made on a project) and the budgeted cost for work scheduled in cost terms. By closely monitoring these two metrics, project managers can quickly identify issues that could impact the successful completion of a project. EVM training provides project managers with the tools they need to accurately track cost and schedule variances, and ultimately to deliver successful projects.


More EVMS Training

Take your EVMS training to the next level with our online course that is based on Humphreys & Associates’ highly regarded three-day EVMS workshop. We also offer a version of this same EVM training course customized for Department Of Defense (DOD) specific EVM requirements, as well as one designed specifically toward NASA’s EVM requirements!

— Purchase the DOD Course —
EVMS DOD Virtual Learning Lab

— Purchase the DOE Version of this Course —
EVMS DOE Virtual Learning Lab

— Purchase the NASA Version of this Course —
EVMS NASA Virtual Learning Lab

EVMS Document Matrix

EVMS Document Matrix

Not sure what the different requirements are between the DOE and NASA? Can’t remember if Cost and Software Data Reporting (CSDR) is required for an NSA contract? Check out our easy to read Earned Value Management Systems Document Matrix


All Online Courses

EVMS is a comprehensive approach to project management that encompasses all aspects of a project, from inception to completion. EVMS courses from Humphreys and Associates will give you the skills and knowledge you need to successfully manage EVM projects of all sizes.

Our EVMS courses are designed for both professionals who are new to EVM and those who are looking to brush up on their skills. We offer a variety of course types, from online self-paced courses to live virtual instructor-led courses. No matter what your schedule or learning style, we have a course that will fit your needs.

Plus, our instructors are experienced EVM professionals who will guide you through every step of the process, from setting up your EVMS system to closing out your project. With Humphreys and Associates, you can be confident that you’re getting the best EVMS training available.

Our online EVMS courses are affordable and convenient, so you can get the education you need without any hassle. Plus, our courses are designed to help you learn everything you need to know about EVMS in a short amount of time.

Get started today and find the perfect online EVMS course for you.

All Online Courses Available from Humphreys & Associates


Upcoming Public EVMS Workshops

EVM training sessions are offered throughout the year by H&A. EVMS, advanced Earned Value Management techniques, and project scheduling are all covered during these frequent public EVM workshops. These earned value education courses are ideal for anybody wanting to increase their understanding of or application of EVMS or scheduling. Our training programs are suited for individuals with various degrees.

Public EVMS Workshops are offered either in person or online. View our Upcoming EVM Workshop Schedule to find one that best suits your schedule and location.

Upcoming Earned Value Training Public Workshops

Contract Performance – Cost/Schedule Variance Trends Read Post »

EVM Contract Performance – Cost Variance

, , ,

No project is ever without some cost variance. Whether it’s the price of materials changing or workers going over budget, costs always seem to creep up on projects. But what can you do to minimize the impact of cost variance on your project? By understanding where these costs come from and planning for them ahead of time, you can keep your project on track despite any bumps in the road. Check out this blog post for more tips on how to handle cost variance in your next project.

Cost Variance may be calculated as part of a Variance Analysis Report or while monitoring an existing contract’s performance.


More EVMS Training

Take your EVM training to the next level with our online course that is based on Humphreys & Associates’ highly regarded three-day EVMS workshop. We also offer a version of this same EVM training course customized for Department Of Defense (DOD) specific EVM requirements, as well as one designed specifically toward NASA’s EVM requirements!

— Purchase the DOD Course —
EVMS DOD Virtual Learning Lab

— Purchase the DOE Version of this Course —
EVMS DOE Virtual Learning Lab

— Purchase the NASA Version of this Course —
EVMS NASA Virtual Learning Lab


EVMS Document Matrix

EVMS Document Matrix

Not sure what the different requirements are between the DOE and NASA? Can’t remember if Cost and Software Data Reporting (CSDR) is required for an NSA contract? Check out our easy to read Earned Value Management Systems Document Matrix


All Online Courses

EVMS is a comprehensive approach to project management that encompasses all aspects of a project, from inception to completion. EVMS courses from Humphreys and Associates will give you the skills and knowledge you need to successfully manage EVM projects of all sizes.

Our EVMS courses are designed for both professionals who are new to EVM and those who are looking to brush up on their skills. We offer a variety of course types, from online self-paced courses to live virtual instructor-led courses. No matter what your schedule or learning style, we have a course that will fit your needs.

Plus, our instructors are experienced EVM professionals who will guide you through every step of the process, from setting up your EVMS system to closing out your project. With Humphreys and Associates, you can be confident that you’re getting the best EVMS training available.

Our online EVMS courses are affordable and convenient, so you can get the education you need without any hassle. Plus, our courses are designed to help you learn everything you need to know about EVMS in a short amount of time.

Get started today and find the perfect online EVMS course for you.

All Online Courses Available from Humphreys & Associates


Upcoming Public EVMS Workshops

EVM training sessions are offered throughout the year by H&A. EVMS, advanced Earned Value Management techniques, and project scheduling are all covered during these frequent public EVM workshops. These earned value education courses are ideal for anybody wanting to increase their understanding of or application of EVMS or scheduling. Our training programs are suited for individuals with various degrees.

Public EVMS Workshops are offered either in person or online. View our Upcoming EVM Workshop Schedule to find one that best suits your schedule and location.

Upcoming Earned Value Training Public Workshops

EVM Contract Performance – Cost Variance Read Post »

EVMS Guidelines and Required Elements

, , , , ,

Video Contents

This video reviews the data points that an Earned Value Management System provides and how variances can be calculated from those data points.  Timely analysis of performance data and variances assists contractors to proactively resolve issues and effectively manage the remaining work on a project.

You can use the links below to jump to a specific part of the video.

Earned Value Contractors’ Internal Systems must be able to provide the following:
00:06Budgeted Cost for Work Scheduled (BCWS)
00:26Budgeted Cost for Work Performed (BCWP)
00:38Actual Cost of Work Performed (ACWP)
00:47Buget At Completion (BAC)
00:52Estimate At Completion (EAC)

Variances can be calculated using the BCWS, BCWP, ACWP, BAC and EAC.
00:58Variances Explanations
01:03Schedule Variance (SV)
01:19Cost Variance (CV)
01:31Variance at Completion (VAC)
01:45Why do we calculate Variances?


01:54EAC and BAC Comparison
2:06What does Variance at Completion (VAC) indicate?
2:18Structure your Earned Value Management System so that Variances can be traced to their source.
2:32Use your existing project management systems.

We also have additional free resources for learning about

You can also find Earned Value Definitions as well as additional free resources for learning more about EVMS concepts like Budgeted Cost for Work Performed (BCWP), Actual Cost of Work Performed (ACWP), Buget At Completion (BAC), and Estimate At Completion (EAC) in our EVMS Education Center and in other posts on this blog.


More EVMS Training

If you liked this video you can purchase the entire course below. This video is an excerpt from the Department of Defense (DOD) version of this eLearning module. We also offer the same course customized for the Department of Energy’s (DOE) specific Earned Value Management (EVM) implementation/requirements, as well as a version of the course customized for NASA’s EVM implementation/requirements.  

— Purchase This Course —
EVMS DOD Virtual Learning Lab

— Purchase the DOE Version of this Course —
EVMS DOE Virtual Learning Lab

— Purchase the NASA Version of this Course —
EVMS NASA Virtual Learning Lab


EVMS Document Matrix

EVMS Document Matrix

Not sure what the different requirements are between the DOE and NASA? Can’t remember if Cost and Software Data Reporting (CSDR) is required for an NSA contract? Check out our easy to read Earned Value Management Systems Document Matrix


All Online Courses

All Online Courses Available from Humphreys & Associates

Earned Value Training

EVMS Guidelines and Required Elements Read Post »

Determining Responsibility for Indirect Cost Variance Analysis – Part 3

, , ,

Indirect Cost Variance Analysis Process

The debate that has continued since the inception of the earned value concepts in the 1960’s has been: “Who should report on and analyze the cost variances attributable to indirect costs?”

This blog is the third in the series of blogs to help answer this question.  The first blog covered a few fundamentals about how indirect cost rates are established to set the stage.  The second blog discussed how indirect rates are applied and how project personnel display indirect costs for internal or performance reporting.  This blog concludes the discussion on the indirect cost variance analysis process.  It covers what the EIA-748 Standard for Earned Value Management Systems (EVMS) and related government agency guides have to say on the subject as well as discussing the best option for determining who is responsible for indirect cost variance analysis.  

Throughout a project’s execution phase, project managers and control account managers (CAMs) conduct their respective performance analysis at varying levels of detail to identify significant cost and schedule variances as well as variances at completion (VAC).  They use variance thresholds to focus on the work elements where challenges or problems are occurring.  As needed, they identify the root cause of the variance and determine the best path forward to mitigate or otherwise reduce the impact of an unfavorable variance.  

This effort includes performing additional analysis not just by the direct elements of cost (labor, material, subcontract, or other direct costs (ODCs)), but also by the indirect costs applied to those direct cost elements to identify the root cause.  For example, the CAMs check for labor variances (rate or efficiency/volume) and material variances (price or usage) to identify any potential issues.  As a side note, remember the rates used to calculate earned value are the same rates used for budget values.  Likewise, actual costs are collected into the same direct cost elements of cost and indirect cost pools as the budget plan elements of cost.  Those actual rates may vary from the budget/earned value rates.

At the total project level, a project manager performs indirect element of cost analysis.  They need to assess whether indirect costs are contributing to the project’s cost variances and quantify the impact.  Since indirect costs are directly related to the base time phased direct costs, it follows the variances for the element of cost categories are similarly skewed.  Figure 1 shows an example (produced from Encore Analytics Empower) of a contract with the variances attributable to the elements of cost (see previous 3-part blog: Planning and Managing EVM by Elements of Cost (EOC)). The indirect cost variances tend to vary with the changes in the direct costs base and/or indirect elements of cost over time at a pool level.  While not common, these could be different from month to month (the lightest blue shaded boxes in Figure 1) when annual, semi-annual, or quarterly rate adjustments occur (the project manager would be notified when these occur).  

Figure 1: Example Cumulative Variance Analysis by Elements of Cost

The project manager and CAMs are also responsible for completing their variance analysis reports.  These include the Integrated Program Management Report (IPMR) Format 5 (Explanation and Problem Analysis) or Integrated Program Management Data and Analysis Report (IPMDAR) Performance Narrative Report.  As part of this analysis, they need to discuss whether rate changes are impacting the project’s current and cumulative cost and schedule variances, as well as the calculated EAC (cumulative to date actual costs plus ETC). 

Customers often require additional indirect cost detail on the formal performance reports when thresholds are exceeded.  The narrative reports are used to address those indirect cost pool base versus rate variances.  Project managers and CAMs (when indirect costs are displayed as part of their budgets), need base versus rate variance analysis from finance or accounting.  Finance or accounting is responsible for establishing the indirect cost rates to date and forecasting what the indirect rates will be for future fiscal years. 

Who is responsible for the indirect cost variance analysis?

Back to our original question: “Who should report on and analyze the cost variances attributable to indirect costs?”  Can the EIA-748 Standard for Earned Value Management Systems (EVMS) 32 guidelines provide any guidance?  There are also various government agencies that place EVMS requirements on contracts.  Do their policies, compliance business practices, or standard operating procedures provide any guidance?  

The fact is, the EIA-748 Guidelines, dating back to the Cost/Schedule Control Systems Criteria (C/SCSC) in the 1960s, have never specified the level where the management and analysis of indirect costs must occur.  The founders of the earned value concept realized there are several levels of management where indirect rates are applied versus the level at which they are displayed for management.  

The EIA-748 Standard for EVMS (Rev D) Guidelines say the following:

4. Identify the organization or function responsible for controlling overhead (indirect costs).

13. Establish overhead budgets for each significant organizational component of the company for expenses, which will become indirect costs. Reflect in the program budgets, at the appropriate level, the amounts in overhead pools that are planned to be allocated to the program as indirect costs.

19. Record all indirect costs which will be allocated to the program consistent with the overhead budgets.

24. Identify budgeted and applied (or actual) indirect costs at the level and frequency needed by management for effective control, along with the reasons for any significant variances.

The Defense Contract Management Agency (DCMA) Cross Reference Checklist (CRC) sub-questions for these guidelines do not specify any particular level where these actions must occur, and do not even mention the control account level.  For example, for the Guideline 4 sub-questions, they reference “the management position” assigned the responsibility and authority for controlling indirect costs.  For one of the Guideline 24 sub-questions, they ask: “Are the variances between budgeted and actual indirect costs identified and analyzed at the level of assigned responsibility for their control (indirect pool, department, etc.)?”  

Likewise, the Department of Energy’s (DOE) detailed Compliance Review Checklist is equally non-specific on the level of management where these actions occur.  Below are excerpts from that DOE document with text highlighted for reference.

E.1E.1 – Indirect Account Organization Structure 
E.1.1Indirect procedures must clearly identify managers who are assigned responsibility and authority for establishing budgets and controlling indirect costs and who have the authority to approve expenditure of resources.
E.1.3The management process for establishing and controlling indirect cost rates should be documented to ensure responsibility is clear.
E.2E.2 – Indirect Budget Management 
E.2.2The contractor must establish indirect (i.e., overhead, burden, cost of money, and G&A expense) budgets at the appropriate organizational level for each pool and cost sub‐ element.
E.2.3Contractor recurring DOE rate performance reviews should be conducted on a regular basis (i.e. monthly, quarterly, etc.) to ensure effective control and management of the indirect expenses and indirect budgets.
E.3E.3 – Record/Allocate Indirect Costs 
E.3.2Periodically, reviews must be made to assure that indirect costs are being charged to the appropriate indirect pools and by the appropriate incurring organization.
E.3.3If incurred indirect costs vary significantly from budgets, periodic adjustments must be made to prevent the need for a significant year‐end adjustment.
E.4E.4 – Indirect Variance Analysis
E.4.1This guideline requires a monthly documented indirect cost analysis to be performed by those assigned responsibility, comparing indirect budgets to indirect actual costs and explaining the cause of resultant variance(s).
E.4.4The contractor should define thresholds for each budget category and a process for management by exception for indirect performance and analysis.

It is not by accident the Guidelines and supporting questions/attributes do not specify any one way all contractors have to manage, analyze, and report on indirect cost variances.  Indirect costs can be handled in a number of different ways.  The Guidelines have always been designed to give contractors the flexibility to manage their projects within the bounds of those Guidelines.  

So, what is a best answer?

While contractors may choose other viable options, a best practice is for the corporate entity responsible for controlling those indirect costs to do the indirect cost variance analysis at the pool levels.  They control the rates, know the reason for variances, and can forecast what the rates will be over time.    As the first blog in this series pointed out, finance or accounting is responsible for establishing and maintaining the direct and indirect rates based on the contractor’s firm and potential direct business base (or volume).  

The designated higher level management entity should also be responsible for providing the necessary indirect cost variance analysis, rate impacts and narrative details to the project managers.  The project managers need to be aware of corporate actions and potential indirect rate revisions that impact the range of EACs they need to prepare for the IPMR or IMPDAR submittals.  This communication is essential so they have the data and narrative text necessary for managing their project, as well as for producing their performance reports explaining the source and impact of indirect cost variances on the project’s EAC to their customer. 

While not a hard requirement, many contractors elect to include both direct and indirect costs in the CAM control account work authorizations.  This does not make the CAMs responsible for these indirect costs since they have little to no control over the indirect rates – they simply apply the current or forecast rates that accounting provides.  But this format does  provide for the necessary visibility CAMs must have regardless in order to conduct the expected variance analysis, inclusive of an assessment of all cost elements (direct and indirect) and price/usage analysis, in order to explain impacts on performance and on their EACs. (See previous blog: EVMS Variance Analysis — EVMS Analysis and Management Reports.) They then forward these to higher level management to incorporate and to provide the rationale for the variances and to determine any corrective action to mitigate the problems. 

Another important advantage of providing CAMs fully burdened budgets, earned value, and actual cost data broken out by the direct and indirect cost elements includes but is not limited to facilitating “make to buy” and “buy to make” decisions because a CAM has an apples-to-apples cost comparison as noted in the second blog

Need help sorting out the best levels for reporting and managing your direct and indirect costs?  Call us today at (714) 685-1730.  


Other Posts from this Series

Determining Responsibility for Indirect Cost Variance Analysis – Part 3 Read Post »

Scroll to Top